Overview
Changes are easiest before you pay. Once an order is placed, its approved scope (files, drawing, material, finish, tolerances, quantity and selected documents) is what the part is produced and inspected against. This page covers revisions before ordering, questions and change approvals during production, and points you to the after-sales process for problems found after delivery.
Revision control before you order
- Use clear file names such as part-name_rev-B.step and part-name_rev-B.pdf.
- Upload the model and the drawing together when both change, so they always describe the same revision.
- Describe what changed when you update a quote.
- Do not assume that a small geometry change will be noticed without a revision note.
- A revised file means a new quote: price, lead time and the matched manufacturing partner may change.
- Read the DFM findings before you pay. If you proceed despite a warning, the consequences of that risk are not treated as a defect later.
How a change affects the quote
| Change | Possible impact |
|---|---|
| Geometry update | Machine time, tooling, material, feasibility, partner matching and price may change. |
| Material change | Availability, finish compatibility, strength and lead time may change. |
| Tolerance change | Inspection effort and the capability required from the partner may change. |
| Finish change | Post-processing, masking, colour and schedule may change. |
| Quantity change | Setup cost per part, unit price and production plan may change. |
| Documents | Adding certificates or inspection reports changes inspection effort, price and which partners can take the job. |
Changing a part after you have paid
A paid order is produced to its approved scope. If you need a different version of a part, the practical route is to cancel the affected part and order the revised file with a new quote. The cancellation rules depend on the part's status: free and automatic before a manufacturer is assigned; after that, a reviewed request in which documented costs already incurred are deducted. Act early: the sooner you cancel, the lower those costs.
Questions and change approvals during production
Manufacturing partners never contact you directly. If a partner needs a clarification or proposes a change, such as more time, a price difference or a technical change, it raises the point with Uretyco, and Uretyco reviews it first. Where your decision is needed, a “Production change approval” appears on your order and you approve or reject it there.
- Uretyco asks for your approval before applying any change that affects what you ordered: geometry, material, tolerances, finish, price or the delivery date shown to you.
- If Uretyco foresees a delay, it proposes a “New delivery date”. If you reject it, the affected parts are cancelled and refunded in full.
- Parts that fail Uretyco quality control are reworked or remade before they ship, at the partner's cost when production caused the problem. You are told if this affects your delivery date.
- If production becomes impossible, Uretyco informs you within 3 days and refunds the amount paid within 14 days.
Problems after delivery
- 1Document the issue
Take clear photos and measurements and note the dimension or drawing reference concerned.
- 2Compare with the approved order
Check the model, the drawing, the stated or default tolerances, the finish, the selected documents and the order notes.
- 3Open a request on the part
In the order detail, use “Returns and other requests” on the part card and choose the matching request type.
- 4Follow Uretyco's instructions
Uretyco reviews the request and, if needed, authorises a return to Uretyco. The outcome is repair, replacement, a refund in proportion to the affected quantity or a price reduction. If no defect is found, the parts are returned unchanged.
Returns and rework in short
Custom parts cannot be returned because you changed your mind. Defective, missing, wrong or damaged parts are always handled: for justified claims Uretyco bears all costs, and refunds go back to your original payment method. The after-sales guide explains the full procedure, including request types, stages, deadlines and refunds.
Preventing issues
- Put all critical requirements on a drawing; anything tighter than the default tolerances must be on the drawing and accepted in the quote.
- Confirm units and revisions before checkout.
- Order prototypes before large batches when the design is new.
- Select certificates or inspection reports at quote time when the risk justifies them.
- Define cosmetic requirements and visible faces before finishing starts.
FAQ
- Can I revise a part after ordering? A paid order is produced to its approved scope. To use a revised file, cancel the affected part (free before a manufacturer is assigned, with documented costs afterwards) and order the new revision with a new quote.
- Will a partner change my design without asking? No. Changes that affect what you ordered need your approval, which Uretyco asks for on your order.
- What evidence helps an issue review? Photos, measurements with the method used, the drawing reference, the order notes and the affected quantity.
- Are custom parts returnable? Not because of a change of mind. Defective, missing, wrong or damaged parts are handled through an after-sales request.
- How is money returned? Always to the original payment method; vouchers or account credit are never imposed instead of a refund.
Related guides
- Returns, Cancellations, and After-Sales RequestsRequest types, claim stages, deadlines and refunds.
- Quality Control & InspectionHow parts are inspected and the default tolerances.
- Material Certificates and Inspection ReportsOptional documents and when to choose them.
- Technical Drawings & TolerancesWhat belongs on the drawing.
- Returns, Cancellation and Refund PolicyThe binding rules.
Can't find what you need? Contact our team for expert assistance with your manufacturing project.